uk-licence-archive
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
uk-licence-archive [2025/06/20 11:20] – [2021] m5aka | uk-licence-archive [2025/07/26 13:50] (current) – [2006] m5aka | ||
---|---|---|---|
Line 4: | Line 4: | ||
{{ :: | {{ :: | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
{{ : | {{ : | ||
Line 13: | Line 17: | ||
* Addition of Section 3 - Conditions relating to Electromagnetic Fields (EMF) Compliance | * Addition of Section 3 - Conditions relating to Electromagnetic Fields (EMF) Compliance | ||
+ | ===== 2018 ===== | ||
+ | |||
+ | * {{ : | ||
+ | * This contains only minor edits e.g. RSGB website URL replaced the reference to the 2007 RSGB Yearbook | ||
+ | * Significantly it does not incorporate any of the 2015 licence changes, e.g. addition of 472 kHz band and 5 MHz segments | ||
+ | * This Interface Requirement is still current at the time of writing, June 2025, however, none of the 2015 or 2024 licence changes have yet been included e.g. Foundation power level and additional bands | ||
===== 2017 ===== | ===== 2017 ===== | ||
- | | + | |
- | * Notice of Variation permitting broadcasting of RSGB news bulletins using the callsign GB2RS | + | * Sample |
+ | * {{ : | ||
+ | * Changes included: | ||
+ | * Addition of clause 1.19 signifying that Callsigns were no longer transferable. Transfer of callsigns had stopped in 2016 | ||
+ | * Clauses 2.2 and 2.3 combined into a single clause | ||
===== 2016 ===== | ===== 2016 ===== | ||
- | * {{ : | + | * {{ : |
* These policy changes were introduced: | * These policy changes were introduced: | ||
* Licence and Terms & Conditions now separate documents | * Licence and Terms & Conditions now separate documents | ||
Line 41: | Line 55: | ||
* Licence came into effect 1 January 2007 with this amendment: | * Licence came into effect 1 January 2007 with this amendment: | ||
* 75500-75875 MHz status changed from Primary to Secondary | * 75500-75875 MHz status changed from Primary to Secondary | ||
+ | |||
+ | * {{ : | ||
+ | * The changes covered: | ||
+ | * Inclusion of Foundation allocations and power levels | ||
+ | * Removal of obsolete licence references | ||
+ | * Section 2 Forward changed to say //" | ||
+ | requirements for the licensing and use of Amateur Radio in the specified frequency | ||
+ | bands."// | ||
===== 2006 ===== | ===== 2006 ===== | ||
Line 57: | Line 79: | ||
* {{ : | * {{ : | ||
- | * The lifetime licence was published, but not issued, | + | * The lifetime licence was published on 4 July 2006 although changes would be made before it was finally issued. The principle changes |
* Combining the three separate licence terms and conditions into one document | * Combining the three separate licence terms and conditions into one document | ||
* Gender neutral language, previous licences had assumed the holder was male | * Gender neutral language, previous licences had assumed the holder was male | ||
Line 87: | Line 109: | ||
* {{ : | * {{ : | ||
- | * These changes were proposed | + | * These changes were proposed: |
* remove Morse requirement | * remove Morse requirement | ||
* give Intermediate holders access to Amateur Satellites | * give Intermediate holders access to Amateur Satellites | ||
* change part of 75 GHz band from Primary to Secondary from 31 December 2006 | * change part of 75 GHz band from Primary to Secondary from 31 December 2006 | ||
+ | |||
+ | ===== 2002 ===== | ||
+ | |||
+ | * {{ : | ||
===== 2001 ===== | ===== 2001 ===== | ||
+ | * {{ : | ||
- | | + | |
- | * BR68/I was issued from 1 October 2001. The previous BR68a/N and BR68b/N Novice licence documents were combined into a single booklet and renamed as Intermediate | + | * BR68/I was issued from 1 October 2001. The previous BR68a/N and BR68b/N Novice licence documents were combined into a single booklet and renamed as Intermediate |
- | | + | |
- | * BR68/F was first used in the [[https:// | + | * BR68/F was first used in the [[https:// |
+ | |||
+ | * {{ : | ||
+ | * Note this document references obsolete licence classes e.g. Class A/B & Novice, Notification number reads "to be added" and Foundation isn't mentioned. Despite that it was made publicly available on the RA's radio.gov.uk site and the Ofcom site in 2004-6 | ||
+ | |||
+ | * {{ : | ||
+ | * On 1 October 2001 Class A/B (' | ||
===== 2000 ===== | ===== 2000 ===== | ||
Line 105: | Line 138: | ||
* 17 August 2000 - Abolition of the requirement to be 14 or over or to have held a Novice licence for at least year before you were permitted to apply for a Full Class A or B licence [[https:// | * 17 August 2000 - Abolition of the requirement to be 14 or over or to have held a Novice licence for at least year before you were permitted to apply for a Full Class A or B licence [[https:// | ||
- | ===== March 1995 ===== | + | ===== 1999 ===== |
+ | |||
+ | * {{ : | ||
+ | |||
+ | * {{ : | ||
+ | * Class A/B licence available from 2 August 1999 | ||
+ | * Callsign prefix ' | ||
+ | * Required a pass in the City and Guilds Radio Amateurs Exam and a 5 WPM Morse test given by RSGB volunteers | ||
+ | * Permitted 100 watts output on all HF bands and 400 watts on bands above 30 MHz | ||
+ | * Reservation for M5AAA-M5AZZ callsigns were accepted from 15 June 1999 | ||
+ | ===== 1995 ===== | ||
- | {{ :: | + | {{ :: |
===== 10 September 1984 ===== | ===== 10 September 1984 ===== |
uk-licence-archive.1750418438.txt.gz · Last modified: by m5aka